Category Archives: News & Updates

Project of the Month

Project of the month: Two Rivers Water Treatment Facility

Strickland Waterproofing is proud to be a part of the Two Rivers project in Gastonia North Carolina!

We are restoring and waterproofing the concrete surrounding the containment pools. SWI is very excited to be a fully trained and certified installer of MG Krete. This incredibly durable and waterproof product can be applied over existing concrete to serve as top surface repair and also to waterproof the surface.  The extreme durability of MG Krete allows us to install this material at a thickness of less than 1/4 inch!  

For more info on MG Krete and other exciting products please contact us at (704)347-1345

 10/23/2017

Restoration Repairs at Moss Lake Dam

Restoration work is a large part of our business. A prominent project we are working on now is the Moss lake dam. On this job, we are doing concrete repairs, repairing all control and expansion joints, installing a 1″ concrete overlay, as well as applying a polyurea coating. For more information, check out this link to the Kings Mountain Herald.

http://kmherald.com/moss-lake-dam-repairs-on-schedule-p7836-144.htm